Urban development works UP-20 Alcossebre (Castellón)

Ingeobras led a project for the Site Management and Health and Safety Coordination of the works to provide the necessary urban services to the land included in the scope of the project in order to transform it into a building plot.

Work carried out 

  • Water supply network
  • Sewage and rainwater drainage network
  • Medium-voltage network
  • Low voltage network
  • Telecommunications network
  • Public lighting network
  • Road network and signposting
Date:
Implementation period:
2015-2016
Location:
Alcossebre (Castellón)