Renovation of drinking water tank DWTP ZUERA (Zaragoza)
Work carried out
Justify and evaluate the works necessary to refurbish, repair and remodel the drinking water tank located at the Zuera Drinking Water Treatment Plant:
– Basic Health and Safety Study
– Waste management
– Structural calculations
– Sanitary conditions
– Specific technical specifications
– Budget assessment
– Assessment of execution deadlines
– Compilation of the documentation to be submitted by the municipality to the health authorities prior to the start of the work