Denitrification water treatment plant in Falset (Tarragona)

Project for the construction and commissioning of a water treatment plant for the elimination of arsenic and nitrates in the town of Falset (Tarragona).

The plant was designed to treat 120 m3/d of water in four hours of operation. It eliminates arsenic chemically and nitrates biologically.

 

Work carried out  

  • Design of the plant
  • Construction of the plant
  • Start-up of the plant
  • Analysis and control ensuring compliance with parameters 
Date:
Category:
Implementation period:
2016-2017
Location:
Teruel, Spain