• Year of implementation: 2016
  • Location: Andosilla, Navarra (Spain)
  • Client: Bodega San Sebastián S. Coop.
  • Description: Project execution, project management and design and supply of anaerobic digester with our own technology (Anaergy). Programming of the control system and automation.