Project pictures
Project data
  • Year of Implementation:: 2016-2017
  • Location: Mahón (Menorca)
  • Description: Design of all elemets that make up the 7300 ha irrigation network in the northwest of the country composed of a total of 105 irrigation pivots. These elements are the following:

– Irrigation network pipelines, including supply pipe from the Kura River.

– Civil works and mechanical equipment of the water intake building.

– Civil works and mechanical equipment of 3 pumping stations distributors with their respective storage reservoirs.

High voltage and low voltage electrical network.